MIL-F-85668(AS)
4.2.1.3 First article acceptance and rejection criteria. Failure of the
system to pass any of the first article inspections specified herein shall be
cause for rejection of the first article sample.
4.2.1.4 First article test plan. A contractor proposed test plan shall be
made available for review and acceptance by the procuring activity (see 6.2.1).
4.2.2 Acceptance test. The acceptance test to be performed on each system
shall be limited to those requirements and procedures specified in Table VIII.
Acceptance test.
TABLE VIII.
Test Procedure
Title
Requirement
4.3.1.2.1.1
Electrical power supply
3.1.2.1.1
4.3.1.3
Major component list
3.1.3
4.3.2.1.1
Positioning accuracy
3.2.1.1
4.3.2.1.2
Dispersion
3.2.1.2
4.3.2.1.3
Firing rates
3.2.1.3
4.3.2.1.4
Clearing cycle
3.2.1.4
4.3.2.1.5
Firing interruption
3.2.1.5
4.3.2.1.6
Turret angular coverage
3.2.1.6
4.3.2.1.6
Azimuth
3.2.1.6.1
4.3.2.1.6
Elevation
3.2.1.6.2
4.3.2.1.6
Depression
3.2.1.6.3
4.3.2.1.7
Angular velocity
3.2.1.7.1
4.3.2.1.7
Elevation velocity error
3.2.1.7.2
4.3.2.1.7
Azimuth velocity error
3.2.1.7.3
4.3.2.1.8
Turret acceleration
3.2.1.8
15